As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED 1C INSPECTION, THE LT OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 20. THE CORRODED AREA WAS SUBSEQUENTLY REMOVED AND A FILLER AND DOUBLER WAS INSTALLED IAW THE EMB SRM. ACFT WAS RELEASED FOLLOWING COMPLETION OF THE 1C INSPECTION.