What was found
A/C IS CURRENTLY IN C CHECK AND DURING AN OPS CHECK THE ROW 12 CEILING AND SIDEWALL EMERGENCY LIGHTS WERE INOP. MX R&R THE NR 3 POWER SUPPLY IAW EMB XR AMM 33-50-04 AND OPS CHECKED GOOD. A/C WILL BE RELEASED WHEN CHECK IS COMPLETE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
A/C IS CURRENTLY IN C CHECK AND DURING AN OPS CHECK THE ROW 12 CEILING AND SIDEWALL EMERGENCY LIGHTS WERE INOP. MX R&R THE NR 3 POWER SUPPLY IAW EMB XR AMM 33-50-04 AND OPS CHECKED GOOD. A/C WILL BE RELEASED WHEN CHECK IS COMPLETE.