What was found
IAH - DURING C-CHECK INSPECTION, THE RIGHT BEAM WAS FOUND CORRODED AROUND A NUTPLATE AT AT FRAME 39. MAINTENANCE PERFORMED A DOUBLER REPAIR IAW ATR42 SRM 51-70-00, AND THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE. TOTAL HOURS: 23,206.6 HOURS. TOTAL CYCLES: 25,658. (X)