What was found
WHILE ACCOMPLISHING SB170-57-0038 ON EO E17X-57MA-004, CRACK DAMAGE WAS DISCOVERED SPAR III LT SIDE, TWO EACH CRACKS APPROXIMATELY 045 INCHES, CRACK INDICATIONS AT THE 4:00 AND 8:00 O’CLOCK POSITIONS. RACKS START AT THE SURFACE OF THE BULKHEAD & EXTEND INTO THE BORE THAT WERE FOUND IN THE CRITICAL FASTENER HOLE ON THE LT SIDE AFTER IT HAD BEEN ENLARGED TO 8MM, .314 INCHES IN DIAMETER IAW THE SB. RT SIDE, TWO EACH CRACKS APPROXIMATELY .045 INCHES CRACK INDICATIONS AT THE 5:00 & 10:00 O’CLOCK POSITIONS. CRACKS START AT THE SURFACE OF THE BULKHEAD & EXTEND INTO THE BORE THAT WERE FOUND IN THE CRITICAL FASTENER HOLE ON THE RT SIDE AFTER IT HAD BEEN ENLARGED TO 8MM, .314 INCHES IN DIAMETER IAW THE SB. THE CRACK DAMAGE WAS REMOVED BY SPOT FACING TO .50 INCHES ON THE LT & RT SIDES IAW ETD2014-170-001927. REPAIR WILL BE ACCOMPLISHED EO E17X-57MA-004.14 UNDER WORK ORDER 908512.