Service difficulty report · Floorbeam · Emb ERJ170200LR

Difficulty date
January 20, 2016
Submitted
January 20, 2016
Operation
Air carrier
Aircraft
N621CZ
Make and model
Emb ERJ170200LR
Aircraft serial
17000218
Aircraft time
22,069 hours, 12,637 cycles
Part
Floorbeam
Part number
17065669003
Condition
Corroded
Location
Fuselage
Part time
22,069 hours, 12,637 cycles
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING BASIC CHECK IN SAT, INSPECTION DISCOVERED CORROSION ON THE AFT CABIN LT AFT BEAM, PN 170-65669-003, UPPER SURFACE ON THE SUBJECT FLOORBEAM. THE DAMAGE DIMENSIONS ARE REPORTED AS FOLLOWS. 1.3 INCH X .90 INCH TO A MAXIMUM DEPTH OF .020 INCH DEEP & 1.3 INCHES X .70 INCH TO A MAXIMUM DEPTH OF .050 INCH DEEP, REF FIGURE 1. REQUESTED & RECEIVED RELIEF IN THE FORM OF ETD2016-170-004262 WHICH PROVIDES A PERMANENT REPAIR BY INSTALLING A REPAIR DOUBLER USING THE PRINCIPLES OF SRM PART II 53-23-10-RE 02P. ENGINEERING HAS CLASSIFIED THIS REPAIR AS A MAJOR REPAIR. THIS REPAIR DOES NOT AFFECT FCS, BUT REQUIRES FOLLOW UP INSPECTIONS. EO E175-53MR-236.1 WILL BE ISSUED TO ACCOMPLISH FOLLOW UP INSPECTIONS. TASK 53-23-005-0001, INTERNAL GVI THRESHOLD OF 20,483FC OR 27,242FH, INTERVAL OF 10,133FC OR 13,476FH PER ETD2016-170-004262 ANAC DER FORM ATTACHED, IS SUFFICIENT & IS MET USING THE INSPECTION REQUIREMENTS, MPG & MRBR REVISION 10. THRESHOLD IS COUNTED SINCE NEW. ACCOMPLISHMENT OF THIS MAJOR REPAIR WAS ON EO E175-53MR-236 UNDER WO 2013215.

More about the Emb ERJ 170-200 LR