Service difficulty report · Doubler · Emb ERJ170200LR

Difficulty date
February 4, 2016
Submitted
February 4, 2016
Operation
Air carrier
Aircraft
N622CZ
Make and model
Emb ERJ170200LR
Aircraft serial
17000219
Aircraft time
21,853 hours, 12,467 cycles
Part
Doubler
Condition
Dented
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING THE ACCOMPLISHMENT OF THE B4 BASIC CHECK, INSPECTION DISCOVERED DENT DAMAGE TO A PREVIOUSLY INSTALLED REPAIR DOUBLER LOCATED, BETWEEN FRAME 21 & 22, STRINGER 13L & 16L. THE DENT DAMAGE MEASURES 10.50 INCHES X 4.0 INCHES TO A MAX DEPTH OF .090 INCH DEEP. ALSO REPORTED TWO EACH DENTS ADJACENT TO THE REPAIR DOUBLER MEASURING 2.60 INCHES X 1.20 INCHES TO A MAX DEPTH OF .012 INCH DEEP & 2.20 INCHES X 1.40 INCHES TO A MAX DEPTH OF .016 INCH DEEP. THE REPAIR DOUBLER WAS INSTALLED ON EO E175-53MR-051 UNDER DISPOSITION ETD2010-170-08975. VT-SAA REMOVED THE DAMAGED REPAIR DOUBLER FOR DAMAGE MAPPING & EVALUATION. REQUESTED & RECEIVED A PERMANENT REPAIR IN THE FORM OF ETD2016-170-011418A. ENGINEERING HAS CLASSIFIED THIS REPAIR AS A MAJOR REPAIR. EO E175-53MR-051.1 REMAINS THE SAME FOR THE ACCOMPLISHMENT OF THE SUPPLEMENTAL FOLLOW UP INSPECTIONS REQUIRED BY ETD2016-170-011418A & ETD2010-170-08975. REF TASK 53-10-015-0002, EXTERNAL DET, THRESHOLD OF 26,129FC INTERVAL OF 9,750FC OR THRESHOLD OF 34,751FH INTERVAL OF 12,967FH, WHICHEVER OCCURS FIRST, IS SUFFICIENT & IS MET USING THE INSPECTION REQUIREMENTS, MPG & MRBR REVISION 11. THRESHOLD IS COUNTED SINCE NEW. ACCOMPLISHMENT OF THIS MAJOR REPAIR WAS ON EO E175-53MR-051.2 UNDER WO 2021319.