Service difficulty report · Floorbeam · Emb ERJ170100LR

Difficulty date
March 18, 2016
Submitted
March 18, 2016
Operation
Air carrier
Aircraft
N749CZ
Make and model
Emb ERJ170100LR
Aircraft serial
17000227
Aircraft time
18,841 hours, 14,653 cycles
Part
Floorbeam
Part number
17065669003
Condition
Corroded
Location
Fuselage
Part time
18,841 hours, 14,653 cycles
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING BASIC CHECK, INSPECTION DISCOVERED CORROSION ON A PREVIOUSLY INSTALLED REPAIR DOUBLER ON THE AFT CABIN, LT AFT BEAM, PN 170-65669-003, UPPER SURFACE ON THE SUBJECT FLOORBEAM. THIS REPAIR DOUBLER WAS INSTALLED ON EO E170-53MR-007 ON 03 28 2012 IAW ETD2012-170-004312A. THE CORROSION DAMAGE ON THE REPAIR DOUBLER DIMENSIONS ARE REPORTED AS FOLLOWS. MULTIPLE AREAS 7.0 INCHES X 2.20 INCHES TO A 100% MATERIAL LOSS IN THE DEEPEST LOCATIONS. THE ORIGINAL DAMAGE TO THE BEAM WAS REPORTED AS 2.0 INCHES X 3.0 INCHES TO A MAXIMUM DEPTH OR .015 INCH DEEP. CURRENT SRM REPAIR SRM PART II 53-23-10 REP 03P WAS DIRECTED BY MFG FOR PERMANENT REPAIR GUIDANCE & ACCOMPLISHED THE SUBJECT PERMANENT REPAIR BUT DEVIATED FROM THE REPAIR BY NOT ACCOMPLISHING THE REQUIRED DAMAGE CUT OUT. REQUESTED PERMANENT REPAIR APPROVAL IN THE CURRENT CONDITION & MFG PROVIDED ETD2016-170-025931B, BUT NOW REQUIRES FOLLOW UP INSPECTIONS. THE INSPECTION INSTRUCTIONS HAVE CHANGED FROM THE ORIGINAL REPAIR. EO E17053MR-007.1 FOLLOW UP INSPECTIONS WILL BE UPDATED IN CM TO REFLECT THE CURRENT REQUIREMENTS OF ETD2016-170-025931B ANAC DER FORM. REF TASK 53-23-005-0001, INTERNAL GVI THRESHOLD OF 20,483 FC OR 27,242 FH, INTERVAL OF 10,133 FC OR 13,476 FH, IS SUFFICIENT & IS MET USING THE INSPECTION REQUIREMENTS, MPG & MRBR REVISION 11. ENGINEERING HAS CLASSIFIED THIS REPAIR AS A MAJOR REPAIR. ACCOMPLISHMENT OF THIS MAJOR REPAIR WAS ON EO E170-53MR-007.2 UNDER WO 2042687.

More about the Emb ERJ 170-100 LR