Service difficulty report · Fitting · Emb ERJ170200LR

Difficulty date
December 12, 2017
Submitted
December 12, 2017
Operation
Air carrier
Aircraft
N619CZ
Make and model
Emb ERJ170200LR
Aircraft serial
17000213
Aircraft time
26,753 hours, 15,746 cycles
Part
Fitting
Part number
17085251401
Part serial
17000213
Condition
Corroded
Part time
26,753 hours, 15,746 cycles
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION HAS BEEN FOUND ON THE AFT CARGO DOORWAY – FWD FITTING P/N 170-85492-403, CENTER FITTING P/N 170-85251-401, AND/OR AFT FITTING P/N 170-85493-403 ON SEVERAL COMPASS AIRCRAFT DURING BASIC CHECK. SINCE EMBRAER CLASSIFIES THESE FITTINGS AS PSES, COMPASS HAS CLASSIFIED REPLACEMENT OF THESE FITTINGS AS A MAJOR REPAIR. IN LIEU OF CONTINUING TO WRITE INDIVIDUAL EOS FOR EACH AIRCRAFT. THIS EO IS BEING ISSUED TO PROVIDE INSTRUCTIONS FOR THE ON CONDITION REPAIR OF CORRODED OR DAMAGED AFT CARGO DOORWAY - FWD, CENTER, AND AFT LOWER SEAL REST FITTINGS BY PART REPLACEMENT. THE REPLACEMENT IS ACCOMPLISHED USING THE EMBRAER PRODUCTION DRAWINGS AND SRM CHAPTER 51 PROCEDURES. SINCE THE DAMAGED STRUCTURE IS BEING REPLACED WITH NEW PARTS PER THE PRODUCTION DRAWINGS, THE AIRCRAFT STRUCTURE REMAINS IN ITS ORIGINAL CONFIGURATION. THEREFORE, NO CHANGES TO THE EXISTING INSPECTION PROGRAM ARE REQUIRED. REV 1: IS BEING ISSUED TO INCLUDE ALL E175 FLEET EFFECTIVITY. REV 2: THIS REVISION IS BEING ISSUED TO ADD A STEP BEFORE THE FINAL STEP TO ENSURE AN SDR WAS SUBMITTED FOR THIS REPAIR.

More about the Emb ERJ 170-200 LR