What was found
REPAIR CORROSION DAMAGE TO THE UPPER FLANGE OF THE FR14 CROSSBEAM BY MULTIPLE CUTOUT AND DOUBLER INSTALLATION IAW ETD2015-170-021492. THAT REPAIR WAS INCORPORATED AFTER A PREVIOUS REPAIR, WHICH WAS DOCUMENTED ON EO E175-53MR-067 REV IR PER ETD2011-170-101290, NEEDED TO BE REPLACED. DURING A SUBSEQUENT INSPECTION OF THE AREA DURING THE B6 BASIC CHECK, NEW CORROSION WAS DISCOVERED ON AND AROUND THE INBOARD CUTOUT FILLER. IN THE TIME SINCE THE ORIGINAL REPAIR ACCOMPLISHMENT, AN SRM REPAIR, SRM PART II 53-00-10/REPAIR 03P, HAS BEEN RELEASED WHICH COVERS THE REPAIR OF THIS DAMAGE. HOWEVER, BECAUSE THE PREVIOUS REPAIR USED ONE MORE FASTENER ROW ON THE CROSSBEAM WEB THAN THE SRM REPAIR, ADDITIONAL DISPOSITION WAS REQUIRED TO ACCOUNT FOR THE DEVIATION. ACCOMPLISHED THE PERMANENT REPAIR OF THE CORROSION DAMAGE TO THE UPPER FLANGE OF THE FR14 CROSSBEAM (P/N 170-21766-409) IAW ETD2019-170-009480. CLASSIFIED AS A MAJOR REPAIR.