What was found
CORROSION TO THE CENTER FUSELAGE I LT LATERAL SEAT TRACK. REPAIRED IN ACCORDANCE WITH PRODUCTION DRAWINGS LISTED IN TABLE 1, SRM CHAPTER 5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION TO THE CENTER FUSELAGE I LT LATERAL SEAT TRACK. REPAIRED IN ACCORDANCE WITH PRODUCTION DRAWINGS LISTED IN TABLE 1, SRM CHAPTER 5.