What was found
WHILE IN HEAVY MX PERFORMING INSPECTIONS, IT WAS NOTED THAT THE NR 3 SLAT OTBD TRACK L/E CRACKED. STOP DRILLED CRACK, PERFORMED HFEC FOR VERIFICATION OF CRACK CONTAINMENT. FABRICATED REPAIR DOUBLER FROM .063" 2024 T3 DIM 10.5" X 9.250" AND FILLER FROM .063" 2024 T3 DIM 1.750" X 1" AND 2.25" X 2". INSTALLED REPAIR, NO OTHER DEFECTS WERE NOTED. ACFT WAS RETURNED TO SERVICE.