Service difficulty report · Switch · Dhav DHC8102

Difficulty date
January 14, 2000
Submitted
April 14, 2000
Operation
Air carrier
Make and model
Dhav DHC8102
Part
Switch
Condition
Failed
Location
Reservoir
Part time
217 hours, 232 cycles
Component
Reservoir-Level- · Vickers · 974641
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING CRUISE FLIGHT, AIRCRAFT HAD A FAILURE OF THE NR 2 HYD RES LEVEL SWITCH CAUSING AN ISOLATION OF THE NR 2 HYD SYSTEM. ALT LANDING GEAR EXTENSION WAS CARRIED OUT. A/C POST MOD 8/2781. PARTS TO BE EXAMINED BY VICKERS.