Service difficulty report · Wire · Doug DC932

Difficulty date
March 13, 2000
Submitted
January 22, 2001
Operation
Air carrier
Make and model
Doug DC932
Aircraft time
74,529 hours
Engine
Pwa JT8D7
Part
Wire
Condition
Damaged
Location
Light
Stage of operation
IN
How discovered
C
Nature of condition
L
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING HEAVY MAINT UNABLE TO RESET CARGO LIGHT CB. WIRING INSIDE ONE FORWARD CARGO LIGHT POT ASSY WAS SHORTING. WIRE INSULATION MISSING AND BRITTLE FROM HEAT. WIRE HARNESS REPLACED IN ALL LIGHT ASSEMBLIES. FLEET CAMPAIGN TO BE CARRIED OUT.

More about the Doug DC-9-32