Service difficulty report · Shaft · Dhav DHC2MK1

Difficulty date
March 21, 2000
Submitted
June 23, 2000
Operation
General aviation
Make and model
Dhav DHC2MK1
Aircraft time
8,719 hours
Engine
Pwa R985AN1
Part
Shaft
Condition
Broken
Location
Fuel Pump
Component
Engine Fuel Pump · Pwa
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ENGINE WOULD NOT RUN WITHOUT WOBBLE PUMP OPERATING. ENGINE DRIVEN PUMP REMOVED AND QUILL SHAFT FOUND BROKEN.