Service difficulty report · Harness · Cndair CL6013A

Difficulty date
April 6, 2000
Submitted
January 19, 2001
Operation
Air carrier
Make and model
Cndair CL6013A
Aircraft time
3,211 hours
Part
Harness
Condition
Peeling
Location
Indicator
Stage of operation
DE
How discovered
O
Nature of condition
O
Precautionary procedure
A, H

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING TRAINING, ON EMERGENCY DESCENT, CREW REPORTED EADI SHOWED FOLLOWING ERROR: DISTORTED IMAGE REDUCED TO 50 PERCENT WITH LATERAL INCLINATION OF 90 DEG. WHEN A/C AGAIN IN LEVEL FLT IND. CAME BACK TO NORMAL. AFTER INSP, MANY ELECT. HARNESS CABLES OF NR 1 EADI WERE FOUND SERIOUSLY DAMAGED.A FEW CABLES REINFORCED TO 2 TWISTED CONDUCTORS, THEMSELVES STRIPPED & BARE:THE CABLING HAD BEEN LEADING TO REAR OF EHSI, LOCATED BENEATH EADI.