Service difficulty report · Transformer · Airbus A330243

Difficulty date
December 20, 2000
Submitted
February 12, 2001
Operation
Air carrier
Make and model
Airbus A330243
Aircraft time
3,214 hours
Engine
Rroyce RB211TRENT77
Part
Transformer
Part number
SP3062
Condition
Failed
Location
Dc System
Stage of operation
CL
How discovered
O
Nature of condition
H, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AFTER DEPARTURE, AN ESSENTIAL TR FAULT AND ATC REPORTED NO TRANSPONDER. KNOWN PROBLEM, AIRBUS TFU 24-32-00-13.TRU RESET AS PER TSM 24-30-00-810-901, AIRCRAFT RETURNED TO SERVICE.PREVENTIVE TRU REPLACED UPON ARRIVAL.

More about the Airbus A330-243