Service difficulty report · Cable · Dhav DHC3

Difficulty date
March 6, 2001
Submitted
April 12, 2001
Operation
General aviation
Make and model
Dhav DHC3
Aircraft time
14,298 hours
Engine
Pwa R1340*
System (JASC)
7603 · Power Lever
Part
Cable
Part number
C3CE12
Condition
Broken
Location
Throttle
Stage of operation
TX
How discovered
O
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING THE PRE-FLIGHT RUN-UP, THE THROTTLE CONTROL WAS NOT RESPONDING PROPERLY. INVESTIGATION FOUND THAT THE FLEX CABLE WAS BROKEN INSIDE THE TUBING.