Service difficulty report · Pump · Snias AS350BA

Difficulty date
March 26, 2001
Submitted
May 25, 2001
Operation
General aviation
Make and model
Snias AS350BA
Aircraft time
4,076 hours
Engine
Tmeca ARRIEL1B
Part
Pump
Condition
Intermittent
Location
Fuel Boost
Stage of operation
AP
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) PILOT NOTED FUEL PRESSURE INTERMITTENT/FLUCTUATING, NORMAL LANDING WAS CARRIED OUT. FUEL PUMP WAS REPLACED TO CORRECT PROBLEM.