What was found
(CAN) ENGINE WAS UNABLE TO ACHIEVE THE RATED POWER WITHIN THE SPECIFIED TEMPERATURE LIMITS. THE OPERATOR DECIDED TO PERFORM AN HSI AND REMOVED THE HOT SECTION COMPONENTS FOR SHIPMENT TO ATLANTIC TURBINES FACILITY IN ATLANTA. AT THIS POINT IT WAS NOTED THAT THE ENGINE HAD SUSTAINED AN HP TURBINE BLADE FAILURE WITH CONSIDERABLE FOD. THE HP & LP TURBINE COMPONENTS WERE FORWARDED TO ATLANTIC TURBINES FOR INVESTIGATION AND RESTORATION TO SERVICEABLE CONDITION.