Service difficulty report · Nut · Boeing 7372E3

Difficulty date
January 30, 2002
Submitted
February 18, 2002
Operation
Air carrier
Make and model
Boeing 7372E3
Aircraft time
42,962 hours
Engine
Pwa JT8D15
Part
Nut
Part number
84821CD524
Condition
Missing
Location
2nd Support
Component
Aft Engine Moun · Boeing · 65491811
Stage of operation
IN
How discovered
V
Nature of condition
W
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) SCHEDULED MAINTENANCE DURING REGULAR SCHEDULED OVERNIGHT MAINTENANCE; AD:99-26-07 (A)(2),INSPECTION OF NR 1 ENGINE AFT MOUNT CONE BOLT SECONDARY SUPPORT, WESTJET ENGINEER FOUND THE SECONDARY SUPPORT NUT, P/N:84821CD-524 MISSING. MAINTENANCE REPLACED THE NUT, PER SB:737-71-1250 AND THE AIRCRAFT RETURNED TO SERVICE WITH NO FURTHER INCIDENTS TO REPORT. REPEAT INSPECTION SCHEDULED WITHIN 300 CYCLES, PRIOR TO 30,160 C.OF AFT MOUNT CONE BOLT AND REPEAT INSPECTION SCHEDULED WITHIN 45 CYCLES, PRIOR TO 29,905 C. OF AFT CONE BOLT INDICATOR.

More about the Boeing 737-2E3