Service difficulty report · Rivet · Bombdr BD7001A10

Difficulty date
February 4, 2002
Submitted
March 4, 2002
Operation
Air carrier
Make and model
Bombdr BD7001A10
Engine
Rroyce BR700710A220
Part
Rivet
Part number
MS90354465
Condition
Jammed
Location
Horizontal Stab
Component
Horizontal Stab · 100551005100
Stage of operation
CR
How discovered
O
Nature of condition
F
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING A/C 20002 FLT 26, AM ELEVATOR BINDING EXPERIENCED BY CREW DURING HANDLING TESTS. AIRCREW TOOK NECESSARY PRECAUTIONS TO EVALUATE FLT CONTROL AVAILABILITY TO PERFORM SAFE LDG W/O HAVING TO DISCONNECT ELEVCCT. FOLLOWING AIR ASSESSMENT, CREW PROCEEDED TO BURN OFF FUEL TO GET WITHIN MLW & CAME IN FOR SAFE & UNEVENTFUL LDG. A/C QUARANTINED BY QA UPON ARRIVAL & THOROUGH INSP PERFORMED BY BFTC ENGINEERING AND QUALITY CNTL. INSP RESULTS REVEALED THAT PIECE OF BLIND RIVET JAMMED BETWEEN GAIN CHANGER OUTPUT CNTL ROD CLEVIS&GAIN CHANGER OUTPUT FORK LEVER.THE BLIND RIVET REMVD&GAIN CHANGER OUTPUT FORK LEVER FOUND TO BE GOUGED AS RESULT OF FOULING.