Service difficulty report · Hose · Amd FALCON20

Difficulty date
August 29, 2002
Submitted
September 12, 2002
Operation
Air carrier
Make and model
Amd FALCON20
Aircraft time
16,569 hours
Engine
Ge CF7002D2
Part
Hose
Part number
MY2078810
Condition
Leaking
Location
Engine Pylon
Stage of operation
TO
How discovered
O
Nature of condition
N
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING TAKE-OFF ROLL, THE PILOT WAS UNABLE TO MAKE ADAPTED EPR ON LT ENGINE. THE PILOT INITIATED REJECTED TAKE-OFF. THE FLIGHT CREW ADVISED ATC, AND RETURNED TO THE MAINTENANCE FACILITY. AMO HAS DETERMINED THAT HOSE ASSEMBLY WAS LEAKING, GIVING A FALSE EPR INDICATION. A NEW HOSE WAS INSTALLED AND ENGINE PERFORMANCE RUN COMPLIED WITH SATISFACTORILY.