What was found
(CAN) IN HANGAR, AT ENGINE INSTALLATION DURING RE CONNECTION OF THE INTERMEDIATE PRESSURE, (IP) DUCT INSIDE THE PYLON NR 3 AREA IT WAS NOTICED THAT THE FLEXIBLE SECTION OF THE PIPE SECTION FOR THE ANTI-ICE TAP-OFF OF THE IP DUCT WAS CHAFED THROUGH. DAMAGE OCCURRED WITH A CLOSE BY BRACKET HOLDING HYDRAULIC PIPES. ONLY THE DUCT ASSEMBLY SUFFERED DAMAGE. ALL COMPONENTS IN THE AREA WERE INSPECTED AND FOUND SECURE AND IN GOOD CONDITION. DUCT SECTION WAS REPLACED, WITH A OVERHAULED DUCT ASSEMBLE. AN INSPECTION WAS CARRIED OUT AFTER INSTALLATION TO CHECK FOR CLEARANCES WITH SURROUNDING COMPONENTS AND ALL WAS CLEAR. A LEAK CHECK WAS CARRIED OUT AND NO LEAKS WERE FOUND.