As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) WHILE COMPLETING FLEET CAMPAIGN H126 FOR PSU WIRING INSPECTION, MX FOUND EVIDENCE OF OVERHEATING AT TWO SPLICES ON THE YELLOW & BROWN WIRES ADJACENT TO 3320P29 AND 3320P45. RE WM 332012 AND 332401. BOTH SPLICES REPLACED. SPLICE DESIGNATORS NOT DETERMINED.