What was found
(CAN)PROPELLER HUB FAILED. NEW HUB INSTALLED. NEW BEARINGS INSTALLED AS PER SB 61-258.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN)PROPELLER HUB FAILED. NEW HUB INSTALLED. NEW BEARINGS INSTALLED AS PER SB 61-258.