Service difficulty report · Bracket · Dhav DHC2MK3

Difficulty date
February 5, 2003
Submitted
March 25, 2003
Operation
Air carrier
Make and model
Dhav DHC2MK3
Aircraft time
13,053 hours
Engine
Pwa PT6A27
Part
Bracket
Part number
C2FS4663A
Condition
Cracked
Location
Tailwheel
Part time
13,052 hours
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING CHANGEOVER FROM FLOATS TO WHEELS A CRACK WAS FOUND ON THE TAIL WHEEL ATTACHMENT LUG. THE CRACK WAS ON THE LT FORWARD ATTACH POINT OF THE TAIL WHEEL. THIS BRACKET ALSO ATTACHES THE HORIZONTAL STABILIZER ON THE UPPER PICKUPS. BRACKET WAS REPLACED WITH A NEW UNIT FROM VIKING AIRCRAFT.