Service difficulty report · Controller · Bombdr BD7001A10

Difficulty date
May 20, 2003
Submitted
May 27, 2003
Operation
Air carrier
Make and model
Bombdr BD7001A10
Aircraft time
24 hours
Engine
Rroyce BR700710A220
Part
Controller
Condition
Malfunctioned
Location
Elevator Tab
Stage of operation
LD
How discovered
O
Nature of condition
F, J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AFTER 10 LANDINGS A STAB TRIM MSG. ATTEMPTED 2 RESETS OF CHANNELS 1 & 2 STAB STUCK AT 5.8 UNITS. LANDED IN OUT OF TRIM CONDITION AT CYUL. INVESTIGATION ON GOING.