Service difficulty report · Pressure Panel · Bac 146200A

Difficulty date
May 21, 2003
Submitted
July 14, 2003
Operation
General aviation
Make and model
Bac 146200A
Aircraft time
36,057 hours
Engine
Lyc ALF502R5
Part
Pressure Panel
Condition
Cracked
Location
Fuselage
Part time
36,866 hours, 36,756 cycles
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING COMPANY SPECIAL FLEET INSPECTION 20 INCH CRACK DISCOVERED IN THE WHEEL WELL UPPER PRESSURE SKIN ALONG AIRCRAFT CENTER LINE AT EDGE OF STRINGER BETWEEN FRAMES 29 TO 32. MANUFACTURE CONTACTED. DAMAGE REPAIRED AS PER BAE REPAIR INSTRU CTION HC532H9018.