Service difficulty report · Shaft · Bolkms BO105C

Difficulty date
May 3, 2003
Submitted
June 16, 2003
Operation
Air carrier
Make and model
Bolkms BO105C
Aircraft time
5,187 hours
Engine
Allsn 250C20B
Part
Shaft
Condition
Sheared
Location
Fuel Control
Component
Fuel Control · Bendix
Component part number
2524644
Stage of operation
DE
How discovered
O
Nature of condition
W
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ONE MINUTE AFTER TAKEOFF DURING A FLIGHT TEST FOR COMPRESSOR STALL, THE NR 2 ENGINE OVER SPEED. THE AIRCRAFT FLEW BACK TO BASE IMMEDIATELY WITH NO FURTHER INCIDENT. THE ENGINE WAS REMOVED FROM THE AIRCRAFT. WHEN THE FCU WAS REMOVED IT WAS NOTICED THAT THE SHAFT WAS SHEARED. IT WAS ALSO FOUND THAT ONE WASHER BETWEEN FCU & GEARBOX WAS NOT INSTALLED. THIS MAY HAVE LED TO THE FCU SHAFT SHEARING. A NEW FCU WAS INSTALLED AND THE ENGINE RAN NORMALLY.