Service difficulty report · Line · Lkheed 10113853

Difficulty date
July 3, 2003
Submitted
July 14, 2003
Operation
Air carrier
Make and model
Lkheed 10113853
Aircraft time
62,272 hours
Engine
Rroyce RB211524B402
Part
Line
Part number
1515762419
Condition
Ruptured
Location
Hyd System
Stage of operation
CL
How discovered
O
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING CLIMB-OUT, A COMPLETE (RAPID) LOSS OFB HYD SYS OCCUR. THE AIRCRAFT RETURNED TO THE STATION WITH NO FURTHER PROBLEM. DURING INVESTIGATION THE (B PRESSURE LINE) TO THE FILTER MODULE, LOCATED IN THE HYDRAULIC SERVICE CENTER WAS FOUND RUPTURED. THE HYDRAULIC LINE WAS REPAIRED IAW MM AND THE AIRCRAFT WAS RETURN TO SERVICE.