As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) PROP RECEIVED FOR 10 YR. CALENDAR O/H. AFTER PAINT REMOVAL FROM HUB CORROSION WAS FOUND ON THE EXTERNAL SURFACES. THIS CORROSION CANNOT BE REMOVED WITHIN THE MANF.'S MINIMUM SPEC'S. THIS PROPELLERHAS EXCEDED THE MANF'S RECOMMENDED CALENDAR TBO BY 60 MONTHS.