Service difficulty report · Bulkhead · Cndair CL6002B19

Difficulty date
November 4, 2004
Submitted
March 3, 2005
Operation
General aviation
Make and model
Cndair CL6002B19
Engine
Ge CF343A1
Part
Bulkhead
Condition
Cracked
Location
Fuselage
Part time
26,106 hours, 20,757 cycles
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) MAINTENANCE FOUND TWO CRACKS ON THE 'SEMI-PRESSURE BULKHEAD' (FS559) NEAR THE AFT AILERON QUADRANT. REPAIR WAS PERFORMED IN ACCORDANCE WITH REPAIR ENGINEERING ORDER (REO) 601R-53-41-256. SUBSEQUENTLY CRACKS HAVE BEEN FOUND ON TWO ADDITIONAL A/C: 06-DEC-04. A/C 7025 (25185FH, 20290FC) REO 601R-53-41-263 20-DEC-04. A/C 7004 (27332FH, 21860FC) REO 601R-53-41-267.