Service difficulty report · Thermal Barrier · Cndair CL604

Difficulty date
October 17, 2005
Submitted
November 1, 2005
Operation
General aviation
Make and model
Cndair CL604
Engine
Ge CF34*
Part
Thermal Barrier
Condition
Failed
Location
Battery
Component
Battery
Component part number
VHP430KH3
Stage of operation
IN
How discovered
9
Nature of condition
M
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING FINAL TOP CHARGE CELL NR 19 WENT INTO THERMAL BARRIER BREAKDOWN. HIGH TEMPERATURE LIMIT WAS REACHED AND THE CELL HOUSING MELTED.