Service difficulty report · Boot · Beech 200BEECH

Difficulty date
March 26, 2007
Submitted
May 1, 2007
Operation
General aviation
Make and model
Beech 200BEECH
Aircraft time
20,981 hours
Engine
Pwa PT6A41
Propeller
Hartzl HCB3TN3
Part
Boot
Condition
Arced
Location
De Ice System
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) PILOTS REPORTED THAT THE IB LEADING EDGE DEICE BOOT WAS NOT FUNCTIONING. THE DEICE SYSTEM WAS TESTED AND THE SNAG WAS CONFIRMED. WHEN THE LEADING EDGE WAS REMOVED TO CHECK THE BOOT SYSTEM EVIDENCE OF SEVERE ARCING WAS FOUND IN THE VICINITY OF THE START RELAYS. IT IS SUSPECTED THAT THE DEICE HOSE WAS ROUTED IMPROPERLY TO THE LEADING EDGE. OVER TIME THE HOSE CHAFED ON THE WIRING FROM THE RELAYS. MAINTENANCE REPLACED THE LEADING EDGE AS WELL AS ANY CONNECTORS THAT WERE DAMAGED. (TC NR 20070327001)