What was found
(CAN) TESTED BEFORE INSTALLATION, THE NEW TANK HAS BEEN FOUND LEAKING BY ONE OF PROBE ATTACHMENT. THE PROBE ATTACHMENT NUT HAS BEEN REPLACED, RETIGHTENED AND TANK INSTALLED IN A/C. (TC NR 20070502001)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) TESTED BEFORE INSTALLATION, THE NEW TANK HAS BEEN FOUND LEAKING BY ONE OF PROBE ATTACHMENT. THE PROBE ATTACHMENT NUT HAS BEEN REPLACED, RETIGHTENED AND TANK INSTALLED IN A/C. (TC NR 20070502001)