Service difficulty report · Boot · Dorner DO328100

Difficulty date
May 7, 2007
Submitted
August 3, 2007
Operation
General aviation
Make and model
Dorner DO328100
Aircraft time
4,852 hours
Part
Boot
Part number
29S7D524007
Condition
Loose
Location
De-Ice System
Part time
55 hours, 73 cycles
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) PILOTS REPORTED LT HORIZONTAL STAB DE-ICE BOOT APPEARS LOOSE. MAINTENANCE INSPECTED THE BOOT AND FOUND THE DE-ICER BOOT HAD COME LOOSE FROM THE AIRCRAFT AT THE AFT EDGES. THE ADHESIVE (3M 1300L) DID NOT SECURE THE DEICER BOOT TO STAB. THE DEICER BOOT WAS RECENTLY REPLACED UNDER WORK ORDER 15249. TIME ON PART 54.6 HOURS AND 73 LANDINGS. DEICER BOOT REPLACED AND AIRCRAFT RETURNED TO SERVICE. (TC NR 20070529004)