What was found
(CAN) DURING AN INSPECTION THE EMERGENCY FLOAT SYS WERE DEPLOYED ACCIDENTALLY. (2) REFURBISHED KITS (PN:28022969) WERE ORDERED. BOTH VALVE ASSY (PN: 105-E-0031) WERE REBUILDED INCLUDING SHEARHEAD ASSY. (PN:29022979) NITROGEN PRESSURE WAS BROUGHT UP TO 3200PSI AND CHECK FOR LEAK. AFTER 2 DAYS PRESSURE STARTED TO DROP SLOWLY. BOTTLE WERE REFILLED WITH NITROGEN TO 3200 PSI AND PRESSURE CONTINUE TO DROP SLOWLY ON LT SIDE. BOTTLE WAS REMOVED FROM FLOAT AND CHECK FOR LEAK. LEAK WAS FOUND COMING FROM SHEARHEAD ASSY. SHEARHEAD WAS REPLACED AND FLOAT RETURNED TO SERVICE. (TC NR 20080130002)