Service difficulty report · Shaft · Swrngn SA226TC

Difficulty date
March 26, 2008
Submitted
May 2, 2008
Operation
General aviation
Make and model
Swrngn SA226TC
Aircraft time
26,302 hours
Engine
Garrtt TPE33110UA
Part
Shaft
Condition
Failed
Location
Hyd Pump
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A ROUTINE INSPECTION OF THE HYDRAULIC PUMP, THE RETAINING BOLT WHICH HOLDS THE SPLINE DRIVE INTO THE HYDRAULIC PUMP HAD SHEARED.