What was found
(CAN) DURING A SCHEDULED INSPECTION OF THE HSTA IN ACCORDANCE WITH THE MAINTENANCE PROGRAM, PSA MAINTENANCE REPORTED LOOSE FASTENERS (ITEM 35, 36, 24, 25) THAT SECURE THE HSTA UPPER ATTACHMENT FITTING (ITEM 33) TO THE HSTAB (SEE ATTACHED ILLUSTRATION) UPON FURTHER INVESTIGATION, IT WAS NOTED THAT THE HOLES THROUGH WHICH THE BOLTS PASS WERE SLIGHTLY DAMAGED AND NEEDED TO BE REWORKED. DETAILS OF THE DAMAGE TO THE FITTING WAS PROVIDED TO BOMBARDIER CRC ALONG WITH A REQUEST TO REWORK THE FITTING (DUE TO NO REPLACEMENT PARTS AVAILABLE). THE FITTING WAS REWORKED IN ACCORDANCE WITH REO 670-55-11-132 WITH A 1000 FH LIMIT AND REPEAT INSPECTION EVERY 150 FH. PSA WILL SCHEDULE THIS AIRCRAFT IN FOR A REPLACEMENT OF THE UPPER ATTACHMENT FITTING ONCE THE REPLACEMENT PART BECOMES AVAILABLE. (TC NR 20081122007)