Service difficulty report · Diode · Raythn HAWKER900XP

Difficulty date
February 23, 2009
Submitted
April 9, 2009
Operation
General aviation
Make and model
Raythn HAWKER900XP
Aircraft time
713 hours
Engine
Garrtt TFE7315R
Part
Diode
Part number
1324088
Condition
Shorted
Location
Panel
Part time
808 hours
Stage of operation
TX
How discovered
O
Nature of condition
B
Precautionary procedure
H

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) PILOT REPORTED SMOKE COMING FROM UNDER COPILOTS SEAT, WITH BATTERY SWITCHED OFF AND MASTER REFUEL PANEL POWERED ON. MASTER REFUEL VALVE WAS OPEN, MAIN FUEL VALVES WERE OPEN. OCCURENCE OCCURED WHILE ACFT WAS PARKED ON GROUND. MX ACTION REMOVED SHORTED DIODES CR9 AND CR10 AND INSTALLED NEW DIODES P/N 132408-8 AT PANEL DA SUBPANEL J. INSTALLED NEW FUSE P/N 5920-99-012-0080 ON ZL PANEL, F23 LOCATION FOR REFUEL PANEL. OPS CHECKED SATISFACTORY IAW MM, CHAPTER 28-22-00.