Service difficulty report · Connector

Difficulty date
April 9, 2009
Submitted
May 13, 2009
Operation
General aviation
Part
Connector
Condition
Shorted
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) CIRCUIT BREAKER B250 (HYD 2 INDICATION) POPPED. WIRE DB1F22 AT CONNECTOR PLUG P12DM (NR 2 PRESSURE TRANSMITTER) SHORTED TO BACKSHELL.