What was found
(CAN) WHILE CONDUCTING THE 1200HR INSP OF THE RT WINDSHIELD ‘ANTI STATIC COATING’ ON G200, IT WAS FOUND UNSERVICEABLE AND DID NOT MEET THE SPEC BY THE MFG IAW MM. THIS REQUIRED WIND-SHIELD REPLACEMENT. ON REMOVAL OF THE WINDSHIELD, FOUND ONE (1) OF THE PWR CABLES HAD ARCED TO ACFT STRUCTURE DUE TO POOR INSULATION ON THE TERMINAL END. CONTACTED MFG AND SENT THEM INFO ON THE FINDINGS. REPLACED WINDSHIELD AND TERMINAL END OF THE PWR CABLE. ON INSTALLATION ENSURED PWR CABLES HAD PROPER CLEARANCES FROM THE ACFT STRUCTURE AND TERMINALS WERE INSULATED. CARRIED OUT FUNCTION CHECK AND OPS CHECK OK. THIS INSP WILL BE EXTENDED.