Service difficulty report · Pitch Horn · Skrsky S76A

Difficulty date
August 16, 2009
Submitted
October 23, 2009
Operation
General aviation
Make and model
Skrsky S76A
Aircraft time
12,609 hours
Engine
Allsn 250C30S
Part
Pitch Horn
Part number
7610305001101
Condition
Cracked
Location
T/R Head
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ROUTINE INSP REVEALED APPARENT CRACK IN T/R PITCH CHANGE BEAM (HORN, ADJACENT TO BUSHING). BEAM SN IS A067-00042. AFTER REMOVAL OF PROTECTIVE PAINT COATING EXISTENCE OF CRACK WAS CONFIRMED BOTH VISUALLY AND BY LPI METHOD. CRACK EXTENDS FROM THE OD OF THE BUSHING OUTWARD TO THE OUTER EDGE OF THE HORN. (SERVICEABLE PART INSTALLED ON HELICOPTER) FOR LOCATION OF DEFECT. PITCH CHANGE BEAM REPLACED, ACFT RETURNED TO SERVICE. DUE TO CRITICAL LOCATION OF DISCOVERED CRACK, OPERATOR TO IMPLEMENT ONE TIME INSP, INCREASED INSP GUIDELINES FOR REPETITIVE INSP, AND PERIODIC NDT WITH FULL O/H CRITERIA INSP.