What was found
(CAN) DURING EN-ROUTE CLIMB ABOVE 6000 FT, CREW HAD THE L AC BUS/R AC BUS/L TRU/R TRU/NR1 AC GEN/NR2 AC GEN/NR1 STALL SYS FAIL/NR2 STALL SYS FAIL/PUSHER SYS FAIL/ICE DETECT FAIL/PITOT HEAT STANDBY/PITOT HEAT 1 AND 2/ENG ADAPTER HEAT 1 AND 2 ILLUMINATE. THESE CAME ON FAIRLY SIMULTANEOUSLY BUT POSSIBLY BEGAN WITH THE LT AND RT AC BUSS CAUTIONS. CONTINUED CLIMB TOWARD FL120 BUT ASKED FOR DESCENT BECAUSE OF ICING PROBLEMS. NR 1 AC GEN REMOVED AND FOUND TO HAVE SHEARED SPLINE. LT AND RT AC CONTROL BOXES INSPECTED FOR LOOSE CONNECTIONS AND LOOSE ARTICLES. NOTHING APPARENT. INSPECTED THE CABLES ALONG THE T/E AND FOUND A CABLE LOOM CONSISTING OF 22 CABLES SHOWING EVIDENCE OF DAMAGE. WIRING REPAIRS IN PROGRESS.