What was found
(CAN) CREW- F/O WINDSHIELD BEGAN TO ARC AS THE FLT WAS ON FINAL APPROACH. UPON TD THE OUTER PANE CRACKED. MX- REPLACED WINDSHIELD, RECORDS SHOW THAT THIS WINDSHIELD HAD BEEN INSTALLED FOR 29200 HOURS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) CREW- F/O WINDSHIELD BEGAN TO ARC AS THE FLT WAS ON FINAL APPROACH. UPON TD THE OUTER PANE CRACKED. MX- REPLACED WINDSHIELD, RECORDS SHOW THAT THIS WINDSHIELD HAD BEEN INSTALLED FOR 29200 HOURS.