Service difficulty report · Wire Harness · Skrsky S92A

Difficulty date
June 1, 2010
Submitted
January 4, 2011
Operation
General aviation
Make and model
Skrsky S92A
Aircraft time
1,396 hours
Engine
Ge CT78A
Part
Wire Harness
Condition
Chafed
Location
Anti Ice Sys
Part time
1,304 hours
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CRUISE TO THE PRODUCTION PLATFORM, THE NR 1 ENG INLET FAIL CAPTION ILLUMINATED AND WOULD NOT RESET USING CHECKLIST PROCEDURES. AFTER CONSIDERING THE ENROUTE WEATHER, THE CREW ELECTED TO RETURN TO BASE. THE ACFT LANDED WITHOUT INCIDENT. MX CONDUCTED AN INVESTIGATION OF THE FAULT AND DURING TROUBLESHOOTING, FOUND THE ANTI-ICE WIRING HARNESSES FOR THE CROTCH ASSY AND ENGINE INLET WAS CHAFED. AN ANTI-ICE HARNESS ASSY HAS BEEN ORDERED. MFG HAS BEEN MADE AWARE OF THE PROBLEM THROUGH THE FIELD SERVICE REP.