Service difficulty report · Thermal Switch · Bombdr BD1001A10

Difficulty date
October 4, 2010
Submitted
March 15, 2011
Operation
Air carrier
Make and model
Bombdr BD1001A10
Aircraft time
1 hours
Engine
Hnywl AS90711A
Part
Thermal Switch
Condition
Failed
Location
Heater Panel
Stage of operation
TX
How discovered
O
Nature of condition
M
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) THE FLIGHT CREW REPORTED THAT DURING THE OFF-LOADING OF BAGGAGE, IT WAS NOTICED THAT THE RT SIDE WALL OF THE BAGGAGE COMPARTMENT WAS VERY HOT. A PLASTIC BAG WHICH HAD BEEN IN CONTACT WITH THE SIDE WALL HAD MELTED. AN INVESTIGATION WAS CARRIED OUT, RT HEATER PANEL PN 3436-05-1/0 (ITEM NOT SERIALIZED) WAS FOUND TO BE INOPERATIVE AND THE PANEL WAS FOUND TO HAVE A VISIBLE TRACE OF OVERHEATING . IT IS SUSPECTED THAT THE THERMAL SWITCH FAILED, THEREBY ALLOWING THE TEMPERATURE OF THE HEATER ELEMENT TO INCREASE TO A HIGH HEAT LEVEL. SUBSEQUENTLY, THE THEORY IS THAT HEATER ELEMENT FAILED PROBABLY DUE TO THE INCREASE IN TEMPERATURE.