Service difficulty report · Switch · Emb ERJ190100IGW

Difficulty date
November 7, 2010
Submitted
March 15, 2011
Operation
Air carrier
Make and model
Emb ERJ190100IGW
Aircraft time
6,363 hours
Engine
Ge CF3410E5A1
Part
Switch
Condition
Malfunctioned
Location
Wow
Stage of operation
CL
How discovered
O
Nature of condition
N
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ON DEPARTURE, THE FLIGHT EXPERIENCE A "WEIGHT ON WHEELS" PROBLEM AND THE NOSE GEAR DOOR DIDN`T CLOSE. THE QRH CHECKLIST WAS FOLLOWED, SUBSEQUENT LG LEVER DISAGREE MESSAGE. THE FLIGHT RETURNED TO POINT OF DEPARTURE WITHOUT FURTHER INCIDENT. NLG SERVICED AS PER AMM 12-12-09-600-801-A. OPERATIONAL TEST OF LDG EXTENSION AND RETRACTION SYSTEM CARRIED OUT SERVICEABLE AS PER AMM 32-33-00-710-801-A. POSSIBLE P/N CAUSING ISSUE: 80-019-01 (PROX SENSOR).

More about the Emb ERJ 190-100 IGW