Service difficulty report · Fuel Control

Difficulty date
August 30, 2011
Submitted
January 23, 2013
Operation
General aviation
Engine
Allsn 250C47B
Part
Fuel Control
Condition
Leaking
Location
Engine
Part time
2,824 hours
Component
Hmu · 23078029
Stage of operation
NR
How discovered
O
Nature of condition
K
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) FUEL LEAK FROM HMU METERING HEAD REGULATOR COVER BOLTS. THERE IS A CEB 73-6054 OUT FOR A ONE TIME TORQUE CHECK ON THE BOLTS THIS CEB WAS CARRIED OUT AT OVERHAUL.