Service difficulty report · Line · Airbus A319114

Difficulty date
September 30, 2011
Submitted
January 23, 2013
Operation
Air carrier
Make and model
Airbus A319114
Aircraft time
39,452 hours
Part
Line
Condition
Failed
Location
Hydraulic Sys
Stage of operation
NR
How discovered
9
Nature of condition
K
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ON PUSH BACK, A LEAK IN THE YELLOW HYD SYS OCCURRED WHICH RESULTED IN APPROX 15 LTRS OF HYD FLUID LEAKING ONTO THE RAMP AT GATE 18. THE CAA WAS NOTIFIED AT 0720 AND RAMP CLEANED UP SPILL IMMEDIATELY. YELLOW SYS PRESSURE LINE AND CHECK VALVE REPLACED AT PRESSURE MODULE AND BOTH YELLOW PRESSURE AND RETURN FILTERS REPLACED ALL IAW AMM 20-23-11-300-004 AND 29-13-45-610-001 AND 29-13-44-610-001. SYS CHECKED NORMAL.